1. |
Sewage collector to the Czajka Wastewater Treatment |
DN 1600 |
216 m |
MPWiK Warszawa |
3LPE outer coating, PUR inner coating (Protec II) |
2019 |
|
2. |
TECHNOLOGICAL PIPELINE IN TURÓW POWER PLANT |
DN 20 – DN 350 |
1250m² |
PGE GiEK S. A. |
Outer painting |
2018-2020 |
|
3. |
TECHNOLOGICAL PIPELINE IN OPOLE POWER PLANT |
DN 20 – DN 300 |
2000m² |
PGE GiEK S. A. |
Outer painting |
2017-2019 |
|
4. |
Steel pipes |
DN 200 – DN 500 |
10500 m² |
Alchemia S. A. |
Outer painting |
2017 - 2020 |
|
5. |
Pipelines supplying aviation fuel at the Chopin Airport in Warsaw |
DN 300 DN 500 |
1600 m |
PP PORTY LOTNICZE / KB POMORZE |
3LPE CLASS C50, 3LPE CLASS C50+ EPOXY LAMINATES |
2016 |
|
6. |
Potable water pipeline. |
DN1200 DN508 |
|
KOMA |
PROTEC II + INTERNAL COATINGFAMOKSYD |
2015 |
|
7. |
TECHNOLOGICAL PIPELINE IN GRUPA AZOTY PLANT |
DN 800 DN 1000 |
|
EKOKAN |
3LPE CLASS.A |
2015 |
|
8. |
KGHM Flotation Pipelines on the landfillŻelazny Most |
DN 1000 DN 1200 |
1200 m |
KGHM |
Abrasion resistant PUR inner coating (Protec II) |
2014- 2015 |
|
9. |
Coolingpipesin theCopper MillGłogów. |
DN 100 – 1200 |
800 m |
Copper MillGłogów |
3LPE outer coating; inner and outer painting. |
2013 – 2015 |
|
10. |
Process Pipelinesfor Bialystok Power Plant |
DN 400 – 600 |
400 m |
Ol- Term Olsztyn |
3LPE outer coating; inner and outer painting. |
2014 |
|
11. |
Pipelines for energy sector – South Germany |
DN 670 |
1700 m |
Kalenborn Bazalt |
inner and outer painting |
2014 – 2015 |
|
12. |
Coalmine ventilation pipes |
DN 250 |
1500 m |
JSW Jatrzębie |
Inner painting |
2013 |
|
13. |
Gas pipeline for LMG Mine Gas |
DN 50– 500 |
3000 m |
LMG Mine Gas |
Outer painting |
2013 |
|
14. |
Pipelines supplying aviation fuel at the airport Pulkovo - St. Petersburg (Russia) |
DN 150 – 500 |
4000 m |
Pulkovo Airport |
3LPE outer coating; inner and outer painting. |
2013 |
|
15. |
Coolingwater supply pipeline to the 70MW block „Przyjaźń” Coking Plant |
DN 400 – 1500 |
400 m |
Koksownia Przyjaźń Dąbrowa Górnicza |
inner and outer painting |
2013 |
|
16. |
Wastewater transmission system from left-bank Warsaw to the Czajka Wastewater Treatment |
DN 1600 |
|
Hydrobudowa Polska SA |
PUR inner and outer coating (PROTEC II) |
2012 |
|
17. |
Modernisation of Hermanowice junction. |
DN 300, 500, 600, 700 |
|
PGNiG Technologie S.A. w Warszawie oddział ZRUG w Pogórskiej Woli |
PUR outer coating (PROTEC II) |
2012 |
|
18. |
Kolnik – Gdańsk pipeline. |
DN 150 250, 300, 500 |
|
Polimex Mostosta |
PUR outer coating (PROTEC II) |
2012 |
|
19. |
LMG Mine Gas |
DN 50 - 450 |
|
PBG S.A. PGNiG S.A. |
Outer painting. |
2011 |
|
20. |
Construction of the road viaduct in Kielce. |
DN 700 |
312 |
SteelTubes |
PUR outer coating (PROTEC II) |
2010 |
|
21. |
Szczytnicki bridge, LG BielanyWroclaw, reconstruction oful.Legnicka Str. |
DN 300, 400, 500, 800 |
|
Anstal |
PUR outer coating (PROTEC II) |
2010 |
|
22. |
COVERED |
DN 350 |
5200 |
FERRUM |
Inner painting HEMPEL |
2010 |
|
23. |
COVERED |
DN 150, 200 |
4100 1100 |
FERRUM |
Inner painting HEMPEL |
2011 |
|
24. |
Reconstruction ofMain Railway Stationin Wrocław |
DN 400, 600 |
|
LINEA |
PUR outer coating (PROTEC II)+ epoxy inner coating |
2010 |
|
25. |
Bytow-Slupsk Pipeline, Fuel pipeline Ostrów Wlkp.-Wroclaw |
DN 500, 400, 500 |
828 1047 1029 |
FERRUM |
Inner painting |
2007 |
|
26. |
Bełchatów S.A. Power Plant Kirchhoff w Gliwicach |
DN 150 - 700 |
|
HYDROMONTEX |
PE |
2007 |
|
27. |
Construction of Wastewater Treatment Plant in Mielec, Tarnobrzeg sewer, bypass in Biecz |
DN 600, 200; DN 500, 300, 150; DN 700, 600; DN 350, 224, 200, 125, 65; |
|
SKANSKA S.A. |
Bitumen insulation + inner painting; 3 LPE SYNERGYB-50 + inner painting; 3 LPE SYNERGYA-50 + inner painting; |
2006-2007 |
|
28. |
Firefighting system EUROFOAM Polska in Zgierz |
DN 350, 200 (100) |
Ok. 700 |
EUROFOAM |
3 LPE Class A |
2006 |
|
29. |
Water pump station |
DN 1200 |
15764 |
Lider Konsorcjum |
3 LPE |
2005 |
|
30. |
MPS Aviation fuel Warehouses construction - Malbork |
DN 200, 150, 100 |
2800 |
Energomontaż - Północ Gdynia |
3 LPE |
2005 |
|